Home › Our Assets › Cloncurry
Our Assets
Cloncurry Copper Project
Status
Exploration and Evaluation
Jurisdiction
Tier 1, Australia
Ownership
100% TNC
Location
North West Queensland
Mineral Resources
152 kt Cu, 171 koz Au, 204 kt CuEq (JORC 2012)
Metals
Copper
Cobalt
Gold
Project Overview
The Cloncurry Copper Project (CCP) is centred on the Great Australia Mine (GAM) Complex, located at Cloncurry in North West Queensland. The CCP hosts a global JORC 2012 compliant Mineral Resource (Measured, Indicated and Inferred) of 20.6 Mt at 0.74% copper and 0.26 g/t gold, containing 152 kt of copper (Cu), 171 koz of gold (Au) and 204 kt of copper equivalent (CuEq) — a 62% increase in contained CuEq since December 2025.
A Pre-Feasibility Study (PFS) and potential maiden Ore Reserve are targeted for completion in late 2026. The PFS is evaluating a right-sized, capital-efficient development pathway that leverages existing infrastructure, established mining leases and regional toll-processing capacity, with a potential mining start targeted from late 2027.
The CCP is supported by extensive existing infrastructure at our Cloncurry Operations Hub (COH), including a 100% owned refurbished solvent extraction (SX) plant, flotation plant, crusher, and heap leach and tailings facilities (currently in care and maintenance).
Resource growth during 2026 has materially expanded the project’s scale. The adjacent Mongoose and Taipan deposits have been consolidated into a single 11.2 Mt resource at 0.76% CuEq following TNC’s acquisition of the Carpentaria Joint Venture interest, and the Wynberg gold-copper deposit has been added to the CCP inventory after a Scoping Study outlined a potential low-capital development pathway. High-grade drilling at Wallace North has confirmed new mineralised structures, including 25 m at 4.2% CuEq outside the existing resource, where approximately 25% of the deposit grades around 4% CuEq.
Ongoing exploration is targeting resource extensions and near-mine growth at Wallace North, Mongoose-Taipan and Wynberg, with drilling planned from late 2026 into 2027. Wallace North remains open along strike and at depth, with high-grade extensions, hanging-wall and footwall lenses, and parallel structures providing follow-up targets.
Multiple compelling mineral systems have also been identified within the CCP district, including Salebury, Marimo, Notlor and Chumvale. Each of these systems remains underexplored but has geological attributes that indicate they are highly prospective for large-scale, transformational Cu-Au-Ag-Co discoveries.
Key Highlights
Extensive Resources
The Cloncurry Copper Project has defined JORC 2012 compliant resources on permitted mining tenure. Approximately 90% of the defined resources for the Cloncurry Copper Project are located on granted mining leases with approvals in place.
Infrastructure Advantage
True North Copper owns crushing, leaching and processing facilities centrally located proximal to power, seal roads and rail infrastructure – linking the Mt Isa Smelter to the Port of Townsville. Milling and concentrating toll treatment facilities, with spare capacity, are within trucking distance from the resource base located on existing mining leases.
Permitted Mine
The Great Australia Mine (GAM) at Cloncurry is fully permitted for heap leach oxide treatment with underutilised tailing facilities and spare heaps ready to feed the SX plant.
Multiple Exploration Targets
Excellent resource growth opportunities on mining leases, close to open pits, identified through new exploration.
Strategic Landholding
True North Copper holds strategic land positions, with multiple large-scale mineral systems, offering potential for company transformational Cu-Au discoveries within an infrastructure advantaged hub.